CAMERR
Inside the VCS 4845 design: a 1,055 ha first activity instance, a 2,000 ha grouped restoration aim, a 40-year carbon forecast and proposed field monitoring. These are filed plans, not verified outcomes.
The PDD describes a grouped restoration project. Its 1,055 ha first activity instance, 2,000 ha grouped aim and 40-year filed carbon model are separate from Planète Urgence’s rounded 1,000 ha programme target and reported outputs.
The Verra record and public PDD, Planète Urgence programme summary and October 2025 monitoring plan were reviewed. Filed commitments are shown as design claims, not verified outcomes. The 41 annual carbon rows total one tonne less than the stated PDD total. Project gallery images are published on Planète Urgence’s CAMERR page; PDD figures remain at their source.
Hitos
- Crediting period beginsObservado en el registro
The VCS crediting period begins on this date.
- PDD issuedReportado
Version 1.0; its crediting period ends 24 July 2062.
Geografía e imágenes
Los límites presentados se muestran junto a imágenes publicadas por las organizaciones del proyecto.
Two filed degraded-area layers in the Wouri estuary. These are proposed project boundaries, not verified restoration.
Use the map controls to zoom · page scrolling does not zoom the map. Geometry is a filed proposal, not an observed restoration outcome.
Map credits and sources

Previsión de carbono
Las estimaciones presentadas son ex ante. No son absorciones verificadas ni créditos emitidos.
Cuando el registro y el PDD difieren, se muestran ambas lecturas y la diferencia queda pendiente de resolver.
The 41 calendar-year rows sum to one tonne below the PDD stated total. The filing labels 2062 as a calendar year, while crediting ends 24 July 2062. Annual rows total 626,476 tCO₂e; the PDD states 626,477 tCO₂e. CAMERR PDD · physical pp. 12–13 ↗
Restauración y biodiversidad
Reported areas have different boundaries and scopes. Bar lengths compare scale only; they do not represent completed restoration.
Tierras y beneficios comunitarios
State-owned mangrove land with local community use rights
DeclaradoMinistry authorisation and free, prior and informed consent asserted
Declarado15 signed agreements covering an initial 17 named villages and camps
DeclaradoPlan described as co-designed, with approval and dissemination promised
DeclaradoEl expediente describe el consentimiento, los acuerdos y el reparto de beneficios. No se establecieron confirmaciones independientes ni importes entregados.
Validación y seguimiento
Measure tree diameter, height, biomass and soil carbon; target precision 10% at 90% confidence, with independent remeasurement of 10% of plots.
CAMERR Monitoring Plan · Oct 2025 · physical pp. 3–6Parcelas sin establecerOctober 2025 monitoring-plan update
Permanent 0.04 ha plots stratified by planting year and degradation
ReportadoTree diameter and height, biomass and soil carbon, with quality checks
ReportadoPermanent plots not yet established in the October 2025 update
No publicado en las fuentes consultadasNo completed validation report or verified removals established; 0 VCUs issued
No publicado en las fuentes consultadasObjetivos de Desarrollo Sostenible
Contribuciones previstas o declaradas por el operador; no se infiere ningún impacto logrado.
No poverty
The operator names this goal, but an individual target indicator was not published in the reviewed source.
- Proposed indicator
- Not specified in reviewed filing
- Monitoring record
- Not individually specified
Icons: United Nations Sustainable Development Goals. The content of this publication has not been approved by the United Nations and does not reflect the views of the United Nations or its officials or Member States.
Cobertura de evidencias
Two degraded-area layers in the filed KML cover about 1,055 ha; this is not proof of planting.
The filed annual rows total 626,476 tCO₂e while the PDD states 626,477 tCO₂e.
No completed validation report or verified removals established; 0 VCUs issued.
The PDD records proponent claims; agreements and consent were not independently checked.
Brecha de evidencia
Límites de lectura
The Verra record and public PDD, Planète Urgence programme summary and October 2025 monitoring plan were reviewed. Filed commitments are shown as design claims, not verified outcomes. The 41 annual carbon rows total one tonne less than the stated PDD total. Project gallery images are published on Planète Urgence’s CAMERR page; PDD figures remain at their source.
Fuentes y límites de lectura
Verra VCS 4845 record and public PDD ↗
PDD v1.0, issued 1 Apr 2025; physical pages cited above.
Planète Urgence programme summary ↗
Separate programme horizon and rounded target.
Planète Urgence CAMERR monitoring plan ↗
October 2025 update; physical pages cited above.
Planète Urgence CAMERR project page ↗
Programme-level description and context; its figures use a broader scope than the VCS activity instance.
The Verra record and public PDD, Planète Urgence programme summary and October 2025 monitoring plan were reviewed. Filed commitments are shown as design claims, not verified outcomes. The 41 annual carbon rows total one tonne less than the stated PDD total. Project gallery images are published on Planète Urgence’s CAMERR page; PDD figures remain at their source.

