CAMERR
Inside the VCS 4845 design: a 1,055 ha first activity instance, a 2,000 ha grouped restoration aim, a 40-year carbon forecast and proposed field monitoring. These are filed plans, not verified outcomes.
The PDD describes a grouped restoration project. Its 1,055 ha first activity instance, 2,000 ha grouped aim and 40-year filed carbon model are separate from Planète Urgence’s rounded 1,000 ha programme target and reported outputs.
The Verra record and public PDD, Planète Urgence programme summary and October 2025 monitoring plan were reviewed. Filed commitments are shown as design claims, not verified outcomes. The 41 annual carbon rows total one tonne less than the stated PDD total. Project gallery images are published on Planète Urgence’s CAMERR page; PDD figures remain at their source.
Jalons
- Crediting period beginsObservé au registre
The VCS crediting period begins on this date.
- PDD issuedDéclaré
Version 1.0; its crediting period ends 24 July 2062.
Géographie et images
Les limites déposées sont présentées avec des images publiées par les organisations du projet.
Two filed degraded-area layers in the Wouri estuary. These are proposed project boundaries, not verified restoration.
Use the map controls to zoom · page scrolling does not zoom the map. Geometry is a filed proposal, not an observed restoration outcome.
Map credits and sources

Prévision carbone
Les estimations déposées sont ex ante. Elles ne correspondent ni à des absorptions vérifiées ni à des crédits émis.
Lorsque le registre et le PDD diffèrent, les deux données sources sont affichées et l’écart reste à résoudre.
The 41 calendar-year rows sum to one tonne below the PDD stated total. The filing labels 2062 as a calendar year, while crediting ends 24 July 2062. Annual rows total 626,476 tCO₂e; the PDD states 626,477 tCO₂e. CAMERR PDD · physical pp. 12–13 ↗
Restauration et biodiversité
Reported areas have different boundaries and scopes. Bar lengths compare scale only; they do not represent completed restoration.
Terres et bénéfices communautaires
State-owned mangrove land with local community use rights
DéclaréMinistry authorisation and free, prior and informed consent asserted
Déclaré15 signed agreements covering an initial 17 named villages and camps
DéclaréPlan described as co-designed, with approval and dissemination promised
DéclaréLe dossier décrit le consentement, les accords et le partage des bénéfices. Leur confirmation indépendante et les montants versés ne sont pas établis.
Validation et suivi
Measure tree diameter, height, biomass and soil carbon; target precision 10% at 90% confidence, with independent remeasurement of 10% of plots.
CAMERR Monitoring Plan · Oct 2025 · physical pp. 3–6Parcelles non établiesOctober 2025 monitoring-plan update
Permanent 0.04 ha plots stratified by planting year and degradation
DéclaréTree diameter and height, biomass and soil carbon, with quality checks
DéclaréPermanent plots not yet established in the October 2025 update
Non publié dans les sources consultéesNo completed validation report or verified removals established; 0 VCUs issued
Non publié dans les sources consultéesObjectifs de développement durable
Contributions inscrites ou déclarées par l’opérateur; aucun impact atteint n’est déduit.
No poverty
The operator names this goal, but an individual target indicator was not published in the reviewed source.
- Proposed indicator
- Not specified in reviewed filing
- Monitoring record
- Not individually specified
Icons: United Nations Sustainable Development Goals. The content of this publication has not been approved by the United Nations and does not reflect the views of the United Nations or its officials or Member States.
Couverture des preuves
Two degraded-area layers in the filed KML cover about 1,055 ha; this is not proof of planting.
The filed annual rows total 626,476 tCO₂e while the PDD states 626,477 tCO₂e.
No completed validation report or verified removals established; 0 VCUs issued.
The PDD records proponent claims; agreements and consent were not independently checked.
Lacune de preuve
Limites de lecture
The Verra record and public PDD, Planète Urgence programme summary and October 2025 monitoring plan were reviewed. Filed commitments are shown as design claims, not verified outcomes. The 41 annual carbon rows total one tonne less than the stated PDD total. Project gallery images are published on Planète Urgence’s CAMERR page; PDD figures remain at their source.
Sources et limites de lecture
Verra VCS 4845 record and public PDD ↗
PDD v1.0, issued 1 Apr 2025; physical pages cited above.
Planète Urgence programme summary ↗
Separate programme horizon and rounded target.
Planète Urgence CAMERR monitoring plan ↗
October 2025 update; physical pages cited above.
Planète Urgence CAMERR project page ↗
Programme-level description and context; its figures use a broader scope than the VCS activity instance.
The Verra record and public PDD, Planète Urgence programme summary and October 2025 monitoring plan were reviewed. Filed commitments are shown as design claims, not verified outcomes. The 41 annual carbon rows total one tonne less than the stated PDD total. Project gallery images are published on Planète Urgence’s CAMERR page; PDD figures remain at their source.