CAMERR
Inside the VCS 4845 design: a 1,055 ha first activity instance, a 2,000 ha grouped restoration aim, a 40-year carbon forecast and proposed field monitoring. These are filed plans, not verified outcomes.
The PDD describes a grouped restoration project. Its 1,055 ha first activity instance, 2,000 ha grouped aim and 40-year filed carbon model are separate from Planète Urgence’s rounded 1,000 ha programme target and reported outputs.
The Verra record and public PDD, Planète Urgence programme summary and October 2025 monitoring plan were reviewed. Filed commitments are shown as design claims, not verified outcomes. The 41 annual carbon rows total one tonne less than the stated PDD total. Project gallery images are published on Planète Urgence’s CAMERR page; PDD figures remain at their source.
Milestones
- Crediting period beginsRegistry observed
The VCS crediting period begins on this date.
- PDD issuedReported
Version 1.0; its crediting period ends 24 July 2062.
Geography and imagery
Filed boundaries sit alongside project imagery published by the project organizations.
Two filed degraded-area layers in the Wouri estuary. These are proposed project boundaries, not verified restoration.
Use the map controls to zoom · page scrolling does not zoom the map. Geometry is a filed proposal, not an observed restoration outcome.
Map credits and sources

Carbon forecast
Filed estimates are ex ante. They are not verified removals or issued credits.
Where the registry and PDD differ, both source readings are shown and the difference remains open.
The 41 calendar-year rows sum to one tonne below the PDD stated total. The filing labels 2062 as a calendar year, while crediting ends 24 July 2062. Annual rows total 626,476 tCO₂e; the PDD states 626,477 tCO₂e. CAMERR PDD · physical pp. 12–13 ↗
Restoration and biodiversity
Reported areas have different boundaries and scopes. Bar lengths compare scale only; they do not represent completed restoration.
Land and community benefits
State-owned mangrove land with local community use rights
ClaimedMinistry authorisation and free, prior and informed consent asserted
Claimed15 signed agreements covering an initial 17 named villages and camps
ClaimedPlan described as co-designed, with approval and dissemination promised
ClaimedConsent, agreements and a benefit-sharing plan are described in the filing. Independent confirmation and delivered benefit amounts were not established in the reviewed record.
Validation and monitoring
Measure tree diameter, height, biomass and soil carbon; target precision 10% at 90% confidence, with independent remeasurement of 10% of plots.
CAMERR Monitoring Plan · Oct 2025 · physical pp. 3–6Plots not establishedOctober 2025 monitoring-plan update
Permanent 0.04 ha plots stratified by planting year and degradation
ReportedTree diameter and height, biomass and soil carbon, with quality checks
ReportedPermanent plots not yet established in the October 2025 update
Not published in sources reviewedNo completed validation report or verified removals established; 0 VCUs issued
Not published in sources reviewedSustainable development goals
Filed or operator-claimed contributions; no achieved impact is inferred.
No poverty
The operator names this goal, but an individual target indicator was not published in the reviewed source.
- Proposed indicator
- Not specified in reviewed filing
- Monitoring record
- Not individually specified
Icons: United Nations Sustainable Development Goals. The content of this publication has not been approved by the United Nations and does not reflect the views of the United Nations or its officials or Member States.
Evidence coverage
Two degraded-area layers in the filed KML cover about 1,055 ha; this is not proof of planting.
The filed annual rows total 626,476 tCO₂e while the PDD states 626,477 tCO₂e.
No completed validation report or verified removals established; 0 VCUs issued.
The PDD records proponent claims; agreements and consent were not independently checked.
Evidence gap
Reading boundary
The Verra record and public PDD, Planète Urgence programme summary and October 2025 monitoring plan were reviewed. Filed commitments are shown as design claims, not verified outcomes. The 41 annual carbon rows total one tonne less than the stated PDD total. Project gallery images are published on Planète Urgence’s CAMERR page; PDD figures remain at their source.
Sources and reading boundary
Verra VCS 4845 record and public PDD ↗
PDD v1.0, issued 1 Apr 2025; physical pages cited above.
Planète Urgence programme summary ↗
Separate programme horizon and rounded target.
Planète Urgence CAMERR monitoring plan ↗
October 2025 update; physical pages cited above.
Planète Urgence CAMERR project page ↗
Programme-level description and context; its figures use a broader scope than the VCS activity instance.
The Verra record and public PDD, Planète Urgence programme summary and October 2025 monitoring plan were reviewed. Filed commitments are shown as design claims, not verified outcomes. The 41 annual carbon rows total one tonne less than the stated PDD total. Project gallery images are published on Planète Urgence’s CAMERR page; PDD figures remain at their source.